OUR SERVICES
The BIM team's mission is to assist organisations in maximizing the value throughout the entire building lifecycle, from the design phase to construction stage to operation management. We provide full BIM services which include 3D BIM modelling, clash analysis and documentations, 4D timeline simulations, 5D quantity take-off as well project visualisations, animations and virtual reality walkthrough.
BIM & CLASH ANALYSIS
2D DOCUMENTATIONS

We provide Full Scope BIM services, by working closely with clients and consultants. Our BIM team has the capability to produce 3D models and runs clash analysis exercise by taking into considerations of the specifications and requirements below -
-
Project specific model elements including with bespoke designs.
-
Project specific model data.
-
Project specific 3D family with working parameters.
-
Naming conventions proposals.
-
Data management within a common data environment (CDE) at every stage and milestone.
-
Model management to suit project’s deliverable timeline.
-
Model management to suit project’s construction sequence.
-
Model management to suit BIM Clash Analysis sequence.

Our team has a vast experience in producing the 2D deliverables following local authority submission requirements. Our BIM technology allows the extractions of 2D documentations from the 3D model. Cutting through sections of the building in the 3D model to reveal required information that can be used as part of the 2D documentation either for planning permission or for construction work. Some major benefits of 2D extractions directly from the 3D models are:
-
2D cross-sections, elevations and floor plans can be produced directly from the BIM model eliminating rework in CAD software.
-
Changes made on the 3D model will be automatically applied in every extracted 2D drawings ensuring consistency in the project as a whole.
-
Minimise human error
4D SIMULATIONS &
5D QUANTITY TAKE-OFF
VISUALISATIONS &
VIRTUAL REALITY

The project timeline simulation (4D Simulation) and BIM driven quantity take-off (5D) are relatively new tools to allow clients to save more time and cost in a project. To date, we have seen limited examples of these services used as a planning or benchmarking tools.
At Bimologie, we provide :
-
Periodic construction sequence and timeline simulations during the construction stage.
-
Assistance to Quantity Surveyors (QS) by providing automatic quantity take-off (5D) directly from our BIM models.
-
Financial projections to visualise time and cost savings.

Bimologie provides our clients exceptional quality for your digital visualisation needs. Our team can turn your ideas into reality via 3D modelling and commercial quality renderings. Our service include:
​
-
Photo-realistic 3D renders for commercial use.
-
360° Panoramic Walkthrough
-
Virtual Reality Walkthrough
-
3D Animations (3ds Max)